Opening: Cash burn meets a gargantuan backlog#
In FY2024 Boeing recorded a net loss of -$11.82B and free cash flow of -$14.4B, even as commercial orders aggregated into a headline $619B backlog that still exceeds 5,900 aircraft. Those three numbers encapsulate the tension that defines Boeing's current investment story: the company is asset-rich on paper but liquidity and execution are under acute strain as it attempts to convert future orders into deliverable, cash-generating aircraft. The financials are drawn from Boeing's FY2024 filings (fillingDate 2025-02-03) and delivery/backlog reporting through mid‑2025; the backlog figure is widely reported in market coverage of Boeing's commercial recovery (see Moomoo commentary).(https://www.moomoo.com/news/post/56075468/boeing-commercial-airplane-revenue-recovers-backlog-grows-to-619-billion)
Professional Market Analysis Platform
Make informed decisions with institutional-grade data. Track what Congress, whales, and top investors are buying.
This is not a story of demand. Demand is evident in the scale of the backlog and the year‑to‑date delivery recovery in 2025. Rather, the immediate problem set is operational: production bottlenecks, FAA‑imposed constraints, supplier issues and episodic labor disruptions have inflated remediation costs, delayed revenue recognition and converted what should be a revenue tailwind into a near‑term cash drag. The FAA's intervention on MAX production expansion remains a material gating factor for any quick fix to Boeing's cash generation challenge.(https://www.faa.gov/newsroom/faa-halts-boeing-max-production-expansion-improve-quality-control-also-lays-out-extensive)
The stakes are practical and quantifiable. Boeing’s FY2024 balance sheet shows total liabilities of $160.28B against total assets of $156.36B, producing negative shareholders’ equity (-$3.91B) — a structural outcome that amplifies market sensitivity to continuing cash‑flow stress even as market capitalization sits near $172B. These figures frame the company’s strategic choices over capital allocation, supplier integration (notably the Spirit AeroSystems discussions), and the pacing of production increases.
Financial performance: the numbers and what they reveal#
Boeing’s top line retreated from $77.79B in 2023 to $66.52B in 2024, a decline of -14.49% driven by fewer deliveries in 2024 versus 2023 and program‑specific interruptions recorded across the year (FY data, fillingDate 2025-02-03). The headline decline masks a volatile 2025 recovery pattern: Q2 2025 revenue was reported up materially versus year‑ago levels on higher delivery counts, but that revenue increase coincided with heavy cash consumption in the quarter as remediation and working‑capital changes outpaced cash inflows.
More company-news-BA Posts
The Boeing Company (BA): Cash Recovery Under Strain Despite Q2 Momentum
Boeing posted a FY2024 GAAP loss of **-$11.82B** and FCF of **-$14.4B**, even as Q2 2025 revenue jumped +35.00% to **$22.7B** — but supplier issues and a defense strike put the Q4 FCF target at risk.
The Boeing Company (BA): Earnings Shock, Balance-Sheet Repair, and the China Deal Variable
Boeing widened FY2024 losses to **-$11.82B**, tightened liquidity but showed Q2 2025 operational improvement — all while talks for a potential 500‑jet China order reframe upside timing.
The Boeing Company: FY2024 Loss, $14.4B Cash Burn and Balance-Sheet Shift
Boeing posted a **$11.82B FY2024 loss**, **- $14.4B free cash flow** and finished with **- $3.91B equity**; this analysis breaks down income, cash flow and leverage.
The income statement trend is one of widening losses and deteriorating margins. Gross profit swung from $7.71B in 2023 to -$1.96B in 2024, while operating income moved from a small negative -$0.81B to -$10.79B year over year. Net income widened by -$9.6B, from -$2.22B in 2023 to -$11.82B in 2024 (FY filings). Those movements reflect both lower delivery volumes in 2024 and program remediation charges plus higher operating expenses tied to remediation and labor settlements.
Cash‑flow dynamics are the most alarming short term. Operating cash flow swung from positive $5.96B in 2023 to -$12.08B in 2024, driven largely by an adverse change in working capital of -$8.77B and higher rework and remediation cash outlays. Free cash flow followed, collapsing from $4.43B in 2023 to -$14.4B in 2024. The delta is stark: Boeing burned nearly $18.8B more free cash in 2024 than it generated in 2023, a move that forced higher reliance on financing and operational levers to preserve liquidity (FY cash flow statements, fillingDate 2025-02-03).
Table: Income Statement Snapshot (FY2021–FY2024)
Year | Revenue (B) | Gross Profit (B) | Operating Income (B) | Net Income (B) | EBITDA (B) |
---|---|---|---|---|---|
2024 | 66.52 | -1.96 | -10.79 | -11.82 | -7.65 |
2023 | 77.79 | 7.71 | -0.81 | -2.22 | 2.31 |
2022 | 66.61 | 3.46 | -3.55 | -4.93 | -0.51 |
2021 | 62.29 | 6.48 | 0.06 | -4.20 | -0.21 |
(Values from company financial statements; fillingDate 2025-02-03 and prior annual filings.)
Table: Balance Sheet Snapshot (FY2021–FY2024)
Year | Cash & Equivalents (B) | Total Assets (B) | Total Liabilities (B) | Total Equity (B) | Long‑Term Debt (B) | Net Debt (B) |
---|---|---|---|---|---|---|
2024 | 13.80 | 156.36 | 160.28 | -3.91 | 52.59 | 40.39 |
2023 | 12.69 | 137.01 | 154.24 | -17.23 | 47.10 | 39.91 |
2022 | 14.61 | 137.10 | 152.95 | -15.88 | 51.81 | 42.66 |
2021 | 8.05 | 138.55 | 153.40 | -15.00 | 56.81 | 50.32 |
(Values from company balance sheets; fillingDate 2025-02-03 and prior filings.)
Those tables show the mechanics: rising liabilities and negative equity coupled with falling operating cash in 2024 create an environment where modest misses in delivery cadence or a protracted supplier disruption translate into tangible liquidity stress. Boeing’s net debt of $40.39B versus a market capitalization near $172.5B implies a net‑debt/market‑cap ratio of roughly 23.4%, a manageable headline leverage metric, but it is the negative equity and operating cash volatility that make leverage interpretation more complex.
Delivery cadence and backlog: the good news, and the caveats#
Demand remains intact; Boeing’s commercial backlog was reported at ~$619B with more than 5,900 aircraft on order as of mid‑2025, which is evidence of persistent airline appetite for single‑aisle and long‑range frames (market reporting summarized by Moomoo).(https://www.moomoo.com/news/post/56075468/boeing-commercial-airplane-revenue-recovers-backlog-grows-to-619-billion) The backlog’s dollar value — calculated largely at list or implied sale prices across configuration mixes — is an asset in theory, but in practice it represents future deliverables that must be converted through a constrained production system.
Delivery counts to mid‑2025 show recovery but remain uneven. Full‑year 2024 deliveries totaled 348 aircraft; H1 2025 reported higher throughput with monthly swings (June 2025 reached roughly 60 deliveries and July stepped back to 48) and the single‑aisle 737 MAX driving much of the increase. Program divergence is important: the 737 MAX is the principal near‑term volume driver, the 787 Dreamliner is ramping slowly with 37 deliveries in H1 2025, and the 777X remains a multi‑year conversion item with first deliveries delayed into 2026 due to engine certification and integration issues. FlightPlan data and industry trackers corroborate the relative delivery performance of Airbus and Boeing through mid‑2025.(https://flightplan.forecastinternational.com/2025/07/10/airbus-and-boeing-report-june-2025-commercial-aircraft-orders-and-deliveries/)
The backlog therefore functions as both an opportunity and a liability. If Boeing can lift 737 MAX production to management’s targets and execute the Dreamliner ramp, the backlog converts to meaningful revenue and margin improvement. Conversely, persistent FAA constraints, supplier fragility or new quality incidents will delay conversion, magnifying working‑capital needs and prolonging negative free cash flow. The seasonal and program mix of deliveries also matters: narrowbody aircraft have lower average selling prices than widebodies like the 777X, so mix shifts influence revenue per frame and near‑term cash realization.
Operational constraints: what’s limiting the ramp and how management is responding#
Three operational constraints dominate Boeing’s ability to convert backlog into cash: regulatory oversight (FAA), supplier performance (notably Spirit AeroSystems and other tier‑1 suppliers), and workforce disruptions. The FAA has signaled that production expansion is conditional on demonstrable quality improvements, effectively capping the free expansion of MAX output until Boeing satisfies a set of remediation and process controls.(https://www.faa.gov/newsroom/faa-halts-boeing-max-production-expansion-improve-quality-control-also-lays-out-extensive)
Supplier shortfalls have a direct throughput impact. Spirit AeroSystems — which supplies large fuselage and forward‑body subassemblies — has been the focal point of capacity and quality issues that ripple through Boeing’s final assembly lines. Management’s announced interest in bringing more critical workstreams in‑house (publicly discussed acquisition attempts and tighter integration measures) is aimed at reducing this choke point, but integration carries cost and execution risk. Management has guided toward producing more 737 MAX frames monthly (targets to reach the low‑40s/month in 2026) and to lift 787 output to 7/month by end‑2025 and 10/month in 2026, conditional on supplier stabilization and FAA sign‑offs.
Labor disputes are a third, discrete drag. The 2024 machinists’ strike and later defense worker actions imposed direct production stoppages and cash costs. Reported estimates assigned aggregate strike costs in the multi‑billion dollar range (market commentary and company disclosures during and after strikes outlined the material impacts). The compounding effect is operational: lines stopped for weeks translate into lost deliveries, backlog reshuffling and higher remediation as schedules compress.
Competitive positioning: Boeing and Airbus in 2025#
The competitive dynamic is one of relative operational execution. Airbus’s production ramp of the A320 family has faced fewer systemic regulatory interruptions, enabling it to outdeliver Boeing on a year‑to‑date basis through mid‑2025 and to convert backlog into revenue at a steadier pace. Industry trackers reported Airbus leading year‑to‑date deliveries with roughly 373 units versus Boeing’s ~328 through July 2025, with Airbus carrying a larger backlog in unit terms (end‑July backlog comparisons reported by industry trackers).(https://flightplan.forecastinternational.com/2025/07/10/airbus-and-boeing-report-june-2025-commercial-aircraft-orders-and-deliveries/)
That gap matters not because demand favors Airbus but because conversion efficiency does. Airbus’s steadier throughput reduces working‑capital swings and provides a cleaner revenue runway. Boeing’s competitive countermeasures — internalizing critical suppliers, targeted quality investments and a staged ramp of 737 MAX and 787 rates — are sensible levers, but they are multi‑quarter to multi‑year fixes that must succeed in the face of FAA scrutiny and upstream supplier reliability.
On program differentiation, Boeing retains pockets of strength: the 737 MAX family remains the industry’s principal single‑aisle workhorse for many carriers, and Boeing’s widebody portfolio (787, eventual 777X) remains strategically important to airline network planning. But those program advantages translate to financial strength only when Boeing can demonstrate predictable delivery cadence and margin control.
What this means for investors#
Boeing’s present profile is a mixture of latent value and execution risk. The $619B backlog is a real commercial asset that embodies years of revenue potential, but it is not an immediate cure for the firm’s cash‑flow shortfall. Investors should think in terms of two interlocked timeframes: the operational workout to restore predictable production (12–24 months) and the longer‑term conversion of backlog into profitable revenue (multi‑year).
In the near term, the critical variables to monitor are FAA signposts on MAX rate increases, quarter‑by‑quarter changes in operating cash flow and working capital, and supplier integration progress (especially any concrete outcomes from Spirit‑related moves). Key financial inflection points will be a return to positive free cash flow and demonstrable margin normalization at the program level — neither of which is guaranteed given the combination of remediation costs and potential further labor disruptions.
For stakeholders focused on financial health, note the balance‑sheet asymmetry: negative shareholders’ equity and volatile operating cash flow amplify the sensitivity to delivery misses. That means even modest disruptions can force incremental financing actions or the re‑phasing of capital expenditures and acquisitions. Conversely, if Boeing achieves its stated rate targets and stabilizes supplier performance, the backlog could convert into sustained revenue growth and meaningful cash generation over time.
Conclusion: conditioned optimism, heavy execution premium#
Boeing today sits at a clear inflection point. The commercial aircraft backlog represents one of the industry’s most valuable pipelines, but converting that pipeline requires a sequence of operational wins: FAA approvals, supplier stabilization, quality control vindication and labor peace. The FY2024 financials — -$11.82B net income and -$14.4B free cash flow — show the penalty of falling short on those execution items. If management can deliver the planned production ramps while containing remediation costs, Boeing’s financial picture should improve. If not, the company will continue to operate with elevated cash‑flow volatility and balance‑sheet sensitivity.
Investors and market participants should therefore track operational milestones rather than headline order counts alone. Specific catalysts to watch are FAA communications on MAX expansion, monthly delivery cadence versus Airbus, quarter‑to‑quarter operating cash‑flow trajectories, and any definitive outcomes from supplier integration efforts. Those milestones will be the practical determinants of how — and when — the company’s large backlog becomes a durable, cash‑positive engine rather than a paper asset complicated by execution risk.
(Company financial figures are drawn from Boeing FY2024 filings — fillingDate 2025-02-03 — and consolidated company reporting; delivery and backlog figures are summarized from market reporting and industry trackers active through mid‑2025, including Moomoo and FlightPlan.)